Concrete Footing Calculator
Volume of concrete needed for a strip footing.
Amortization schedule
| # | Payment | Principal | Interest | Balance |
|---|---|---|---|---|
Growth over time
| Year | Invested | Value |
|---|---|---|
Introduction
Concrete Footing Calculator — Volume of concrete needed for a strip footing. Enter Length (m), Width (m), Depth (m), Waste (%) to get an instant, accurate result.
Formula
Volume = length × width × depth of the footing trench, plus a waste percentage allowance, converted to cubic yards.
Step-by-step
- Enter the Length (m).
- Enter the Width (m).
- Enter the Depth (m).
- Enter the Waste (%).
- Click Calculate to see your result instantly.
Real-world example
Example: With Length (m) = 10, Width (m) = 0.5, Depth (m) = 0.3, Waste (%) = 5, the Concrete Footing Calculator gives Volume M3: 1.575, Volume Without Waste M3: 1.5, Volume Cubic Yards: 2.06.
Frequently Asked Questions
How deep should a footing be?
Does this include the stem wall above the footing?
What inputs does the Concrete Footing Calculator need?
How accurate is the Concrete Footing Calculator?
Is the Concrete Footing Calculator free to use?
About the Concrete Footing Calculator
The Concrete Footing Calculator uses a real, verifiable formula — Volume = length × width × depth of the footing trench, plus a waste percentage allowance, converted to cubic yards. — so results are accurate every time, not an approximation.